Master Bathroom Reno {Day 4}

We have survived the last four days of the master bathroom reno.  It is dusty in the house, but it will all be worth it when the bathroom is finished next week!

While the contractor finished demoing the bathroom on Tuesday, my hubby and I went to Floor and Decor to select the new tile.  We went with a neutral porcelain 13×13 tile called castello beige.  We also found the matching smaller tiles for the shower floor.

photo 1

This is what has been done the last four days…

photo 1

Yes…that would be our toilet in our bedroom.  A new meaning to the term “on suite”

photo 2

photo 4

photo 5

photo 3

Since the sub-flooring wasn’t ruined under the tub, we didn’t need to replace any sub-flooring or have to remove the tub, which saved us a lot of money…phew!

Screen Shot 2014-02-20 at 11.00.38 AM

Do you notice anything different in the picture on the right?  The shower is 8 inches larger than before.  I know 8 inches doesn’t seem like a huge difference but it makes a world of a difference.  I am so excited!

photo 1

photo 3

photo 4

As you can see a lot has happened in the last four days.  Tomorrow, the contractor will start tiling around the tub.  I can’t wait!

Check back tomorrow for another update!

Signature

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s